You will need to attach your concept plans to this application. The plans enable us to accurately assess your application and need to show:

  • Water Corporation assets and other existing services overlaid on your work plans
  • Potholed location of our asset
  • Details of how you propose to protect/relocate our asset (if relevant)
  • Final surface levels and elevations
  • Before You Dig Australia plans

Please note, we're making changes to this form. You will soon see new options to tell us about the type of work you're doing.

All fields are required unless marked as optional

Your details

Location of proposed works

Where does the location fall under? *

About the proposed works

You need to allow a minimum of 28 days from application to works commencing. An indication of time frames will be provided once we've reviewed your application.

Which of the following best describes the type of work you are doing? *
Have our assets been potholed for exact locations and depths? *
Are there surface level assets that require modifying? (e.g access chamber lids, hydrants, valve covers) *
Are your proposed works within our standard alignments (water 1.8-2.4m, wastewater 3.0-4.2m, drainage/trunk 4.2-5.0m)(excluding crossings)? *
Will there be any vehicles or machinery greater than 7 tonnes moving over our assets? *
Are excavations for launch or receival pits within 6 meters of our assets? *
Is there any proposed ground breaking? *
Are excavations for launch or receival pits within 6 meters of our assets?
Is the existing surface level proposed to be cut more than 100mm over our assets (including box-outs)? Design plans should clearly show existing and proposed levels *
Is the existing surface level proposed to be filled more than 250mm over our assets? Design plans should clearly show existing and proposed levels *
Are any box-outs proposed? Design plans should clearly show proposed box-out depths *
Are there any additional carriageways proposed? *
Is there any vibrating compaction proposed? *
Are our assets within the proposed road closure? *
Is the road closure intended for private sale of the land? *
Will the proposed road closure remain as a reserve with public access? *
Is there any vibrating compaction proposed? *
Is this for works on behalf of a telecommunication provider? *
Is the application for planting new trees? *
Is the application for removing existing trees? *
Do any trees involved have mature heights over 5 metres? *
Would our assets be exposed in the proposed excavation? *
Has there been previous correspondence with the Corporation regarding this project? *

Documents

Your design plan needs to show

  • Water Corporation assets and other existing services overlaid
  • Potholed location of our asset
  • Details of how your propose to protect/relocate the our asset (if relevant)
  • Final surface levels and elevations

Additional information